The Facility Advisory Committee (FAC) recommended and the Board of Trustees approved the following items:
Modernization of Bel Air High School, which includes maintaining the newest and most viable parts of the campus, while replacing the original classroom wing.
Building a new Scotsdale Elementary School on the existing site.
Building a new Dolphin Terrace Elementary School on existing site.
Building a new Hanks Middle School. This proposed campus would replace two middle schools with low utilization rates: Desert View Middle School, and Indian Ridge Middle School.
Building a new Riverside Elementary School, which consolidates two existing campuses: Ascarate Elementary School and Cedar Grove Elementary School This new campus will be built on one of the existing schools’ sites.
Renovations and improvements to Riverside High School, which includes the career and technology facility.
All High Schools will include new multipurpose turf at the baseball and softball fields.
The Bond 2019 includes an investment to convert swamp coolers to refrigerated air systems at campuses throughout the district.
The Bond 2019 also includes safety and security upgrades and improvements across the district including measures such as secure entry vestibules, fire sprinkler systems, fire alarm systems, ballistic film, key card access doors, and ADA accessibility improvements at many of the campuses in our district.